Work center loading plan from Acumatica production orders

Production orders flow in from Acumatica and load onto each work center automatically, by due date and real capacity.

Before

Every week the planner exported production orders from Acumatica and built the schedule by hand in a spreadsheet, line by line, then rebuilt it whenever anything changed.

After

Orders sync from Acumatica and are scheduled onto each work center using production standards and available hours. Late orders stand out right away.

Result

6 hrs / week

About 6 hours a week: most of the day the planner used to spend building and rebuilding the schedule. Built for about $3,000; paid for itself in about 4 months.

The problem

The schedule lived in a spreadsheet that one person rebuilt every week from Acumatica exports. A rush order or a machine down meant starting over, and nobody could see which orders would be late until it was too late.

What I built

  • Production orders synced from Acumatica
  • Hours per order calculated from production standards (pieces per hour)
  • Orders loaded onto each work center automatically, by due date
  • Change the available hours (overtime, a second shift) and see the impact right away
  • Late orders highlighted, with a history of every change

Who else could use this

Any shop with machines, lines or crews to schedule: fabrication, food, packaging, print shops.